flexsys logo
 
 

 

 
Key parameters

Efficient Use Of Building Envelope

Need for ceiling voids eliminated

If false ceiling used, 200mm clear void for air flow needed

300mm clear floor void required (for full cooling and heating system)

Building heights reduced between 100–200mm per floor

 
     
   
     
   
     
   
  Click picture to enlarge