flexsys logo
 
 

 

 
Key parameters

Capital Costs

3.5% reduction in total building cost compared with equivalent 4-pipe fan coil installation

6.2% reduction in total building cost compared with equivalent overhead VAV system

12.35% reduction in total building cost compared with an equivalent displacement system using chilled ceiling panels

Additional saving through reduced fit out cost